Extension diary
Wednesday, 15 May 2013
full steam ahead!
finishing touches
sink on the move
outside tap moved
build a bike?
new window to wash up by
all plastic plumbing under the insulation!?!
peek a boo into the toilet
sink gone
nice view
pipes take a detour
first coat of cement below landing window
study pipes
gas a CH to utility
cosy?
like camping
insulated floor
Monday, 13 May 2013
plastering and pipe fixing
high light
stud wall
re-potted and weeded
view from the sink
A bright blustery day outside
multi-storey guttering
the tools
shades of brown
lighting effects
Saturday, 11 May 2013
another dragon design by elena
plastering nearly done in study, utility coming along, plumber resurfaced
Tuesday, 7 May 2013
Back to blogging- android still ill
lovely weekend weather
stud wall goes in
some missing bits!
Rob's last football match as a junior
cryptic sign on bus stop
the only bit of shed that's left
borrowed light
masses of waste insulation, not very green
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)